NOTIFICATION:
Solicitations are provided on this page for information purposes only. All RFP’s and IFB’s that are required to be publicly posted are posted on Rocky Mountain E-Purchasing System. RFP’s and IFB’s provided on this page may or may not be up to date, and may or may not include required amendments or addenda. Failure of an Offeror to comply with provisions of an RFP, IFB, addendum/amendment due to anything provided, or not provided, on this page, will not be excused by the City of Colorado Springs. The RFP’s or IFB’s included on Rocky Mountain E-Purchasing System and Bonfire Interactive Procurement Portal remain the authoritative and valid version for procurement purposes.
Not all open RFP’s and IFB’s are listed yet.
Open RFPs and IFBs
CSPD Training Academy Needs Assessment
CSPD Uniforms Provisioning
Transit On-Call Overhead Door and Gate Repair
On-Call Services for Bus Fuel Storage Systems
DBE Program Review and Goal Determination
Special Events Security
Transit Campus Expansion (TCE) Chargers Installation
Traffic Management System Expansion & Intersection Control Upgrades
Colorado Springs Airport Common Use Passenger Processing System (CUPPS)
2050 Regional Transit Plan, Specialized Transportation Plan and ZEV Transition Plan
Wasteless COS
Communication Circle Wall Replacement Project
Active Roles Renewal
Pikes Peak America's Mountain Shuttle Services
Transit Security Services
Twin Bridges and Royer St Railroad Crossing Relocation Project
IT Asset Management (ITAM) Tool RFI
Taxiway B Rehabilitation Phase 2
On-Call Tree Pruning and Removal
Transit Campus Expansion (TCE) Chargers Installation
Rustic Hills Road Improvements
Title VI Program Update
Slurry Seal Maintenance Services
Fire Station #25 Remodel Design Services
Cottonwood Creek Channel Improvements at Cottonwood Apartments
Investment Management Services
Blodgett Open Space Master PlanA plan for the development of a portion of the city that contains proposed land uses, a generalized transportation system, and the relationship of the area included in the plan to surrounding property.
Tree Pruning & Removal Services – West Colorado Ave Corridor
30 Foot-Class & 35 Foot Low Floor Transit Bus Purchase
- RFP R22-154 DS
- Attachment A - Cost Proposal
- Attachment B - Spare Parts Price Proposal
- Attachment C - Bus Specifications
- Addendum 02
- Addendum 03
- Addendum 04
- Pre Proposal Sigh In Sheet
CMGC Services for Fire Station #24
2C Paving Additional Vendors
1145 Transit Dr. Electric Meter Retrofit
Antlers Park Dog Park
Bomgar Software
Structural Repairs for City Parking Garages
Unity Pro Support Renewal
3D Printed House Design Services
South Downtown Railroad Underpass Reconstruction Project Professional Services
Annual Crowdstrike Renewal
Transit Fleet On Board Maintenance of IT Systems
Legacy Loop: Rock Island Trail Construction Project
Galley Road Widening
Falcon Substation Fuel Site Improvements
Fleet Maintenance & Management Services
Sidewalk Vertical Displacement Mitigation (SVDM)
Monument Survey 2C & PPRTA
Janitorial Services for the Patty Jewett and Valley Hi Golf Course Clubhouses
PeopleSoft Grants, Contracts, Project Costing Module Implementation
POC Substation Fuel Site Infrastructure Improvement
Tree Pruning Services - S. Carefree Circle Corridor
Prospect Lake Pond Liner Repair
Permit Coordinator/ Inspector Right of Way (ROW) Inspection Services
Bus Wash Service Agreement RFQ
Fisher's Canyon Fuels Mitigation
PPRTA Pipe Lining Projects
Tejon Street Revitalization Design Services
Asset Management System
Judicial Information System Final
Food and Beverage Services - Airport
Paseo Road Box Culvert
Fontanero Street & 31st Street Intersection Improvements
On-Call Transit Vehicle Inspections
Black Squirrel Creek Phase 1 and Phase 2
Special Projects Project Manager
Memorial Park Sidewalk and Parking Lot Improvements
City of Colorado Springs Police Department De-Escalation Virtual Reality Equipment and Training Project
City of Colorado Springs Electronic Ticketing Project
Circle Drive Bridges Replacement Project
Monument Valley Park: Duck & Shadow Lakes Project
Shadow Lake Irrigation Project (ARPA)
Duck Lake Irrigation Project (ARPA)
Municipal Court Audio Visual Upgrades
Creative Marketing
Jimmy Camp Creek Archaeological Survey
Aging Terminal Project COS Airport
Irrigation Design Services – Patty Jewett and Valley Hi Golf Courses (ARPA)
Transportation Security Administration (TSA) Queueing Area Expansion
City-Wide Elevator Maintenance
Bandshell Feasibility Study for Acacia Park
Root Plate Removal
Fire Alarm System Replacement - ARPA Funded
Medical Plan Administration
PikeRide Expansion Construction Project
South Monument Valley Water Utility Design Project – ARPA Funded
Adaman Alley CMGC
CSPD POC Generator Replacement Project
On-Call Air Service Development Consulting
222 East Pikes Peak Avenue - Professional Services
eSignature Services
Automatic Passenger Counter Purchase and Installation
- RFP R22-025DS
- Price Sheet R22-025DS
- Addendum 01 R22-025DS
- Addendum 03 R22-025DS
- Addendum 04 R22-025DS
- Attachment B R22-025DS
- Attachment C R22-025DS